
Home Additions · Palmetto Bay, FL
More house, same address.
Rear extensions, second stories, and in-law suites for Palmetto Bay homes, engineered from the foundation up, permitted through the Village, and run by one licensed general contractor with daily supervision.
Home Additions in Palmetto Bay
Room to grow in Palmetto Bay.
Palmetto Bay families tend to stay put, and it is easy to see why: big lots, good schools, canopy streets, and Coral Reef Park down the road. So instead of leaving, owners in Tanglewood Estates, Coral Reef Estates, and East Palmetto Bay extend. The classic moves are a rear family-room wing opening to the yard, a primary-suite addition, a garage converted into an in-law suite, or a full second story on a one-level sixties ranch. On lots this size, the architecture has room to breathe while the addition earns its keep.
Additions here answer to the Village of Palmetto Bay Building and Permitting Department, and to a few realities beyond it. Zoning setbacks and lot coverage limits shape the footprint. The Village administers FEMA floodplain rules, so on homes in a Special Flood Hazard Area, particularly east of Old Cutler Road, the substantial improvement calculation can influence how much you build at once. Palmetto Bay is also a Tree City USA community, and removing or building near protected trees means a Miami-Dade DERM permit. None of this is a problem for a contractor who plans for it on day one.
An addition lives or dies at the connection points, which is why PGX starts with structure: foundations tied correctly to the existing slab, tie beams and columns engineered for wind load, and a roof line that reads as original rather than annexed. You get a fixed written scope before ground breaks, a supervisor on site daily, and stucco and finishes matched so closely the addition disappears. With more than 150 remodels and additions behind us in South Florida, we know exactly where these projects go wrong, and we schedule those spots first.

Where we work in Palmetto Bay
Elsewhere in Palmetto Bay? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
Additions we build on these lots.
From a single new wing to doubling the square footage, each addition below is engineered, permitted, and priced before the first truck arrives.
Rear wings toward the yard
Family rooms and kitchen expansions built out toward the yard, with structural openings that erase the line between old house and new.
Second stories, family still downstairs
Full upper floors over existing ranches, with foundations verified, columns and tie beams engineered, and the family usually still living downstairs.
In-law suites
Garage conversions and detached-feel wings with their own bath and entry, drawn to meet Village zoning rather than argue with it.
The unglamorous half, engineered
New footings tied into original slabs, tie-beam upgrades, and wind-load engineering, the unglamorous half of every addition done visibly right.
Seamless envelope matching
Roof tie-ins, stucco texture, and window lines matched to the existing house, so nobody can point to where the addition starts.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
Can I add a second story to my Palmetto Bay ranch?
How close to my property line can I build an addition?
Does the flood zone affect my addition east of Old Cutler Road?
Will you have to remove trees for the addition?
How long does a home addition take from design to done?
Contact
Sketch the addition with us
Bring the idea; we will bring the structural questions and a written estimate for your Palmetto Bay addition, in English o en español.