
Home Additions · Ponce-Davis & High Pines, FL
Room to grow, no teardown required.
Home additions across Ponce-Davis and High Pines: rear extensions, second stories, and in-law suites engineered to current code, permitted through Miami-Dade County, and supervised every working day under license CGC1539072.
Home Additions in Ponce-Davis & High Pines
Acre lots were made for this.
Ponce-Davis lots run from half an acre to well over an acre, which means most owners who need space do not need to move; they need a contractor who can add it. Families here stretch 1950s ranches with rear wings and new primary suites, put second stories on homes near Red Road and Sunset Drive, and convert garages into gyms, offices, and in-law quarters. With Gulliver, Epiphany, and St. Thomas Episcopal minutes away, this is a neighborhood people settle into for decades. The houses have to keep up.
Additions in unincorporated Miami-Dade go through county RER review: a zoning check on setbacks and lot coverage, full structural plan review, and a DERM tree permit if the footprint forces a protected oak to be removed or relocated. New foundations must tie correctly into old ones, and tie beams often need upgrading before a second story is even a conversation; our engineers design for that, and the county verifies it. Ponce-Davis has no municipal design board, but the inspectors read plans carefully. So do we.
An addition done right should read as original to the house: the same floor level, matched roof lines, stucco that does not telegraph the seam. PGX carries the full chain of survey, engineering, county permits, construction, and finish work under one fixed written scope, with a supervisor on the property daily and staging that respects a quiet street. You keep living in the house while we build. We keep the site contained, the schedule honest, and the paperwork airtight from estimate through warranty.

Where we work in Ponce-Davis & High Pines
Elsewhere in Ponce-Davis & High Pines? Call us — if it's in Miami-Dade or Broward, we probably build there.
What's included
How we grow a house here.
From single-room bump-outs to full second stories, every addition we build is engineered, permitted through Miami-Dade County, and finished to match the original home.
New wings on acre lots
Family rooms, kitchens, and primary wings extended into deep back yards, with new foundations doweled into the existing slab and roof lines carried through cleanly.
Second floors over 1950s ranches
Full upper floors built over strengthened tie beams and columns: engineering first, county-approved plans second, then a house with twice the room.
In-law quarters, legally habitable
Attached or detached quarters with proper baths and kitchenettes, designed and permitted as legal habitable space rather than wink-wink storage.
Garages turned into gyms and offices
Garages reborn as gyms, studios, and offices with insulation, conditioned air, and legal egress, plus an honest plan for where the cars go.
Structural and foundation work
Underpinning, new footings, and tie-beam upgrades designed by licensed engineers and inspected by Miami-Dade County at every required stage.

How we work
A remodel is a promise. We keep it in writing.
AFixed scope, honest pricing
A detailed written scope before we start — so the number you sign is the number you pay, and changes are decisions, not surprises.
BA superintendent on site, daily
Your project is run by someone whose name you know, who answers the phone, and who walks the site every working day.
CBuilt to code, warrantied in writing
HVHZ-rated products, inspected phases, closed permits, and a written warranty when we hand back the keys.
How it goes
From first walk to final walk-through.
Walk-through & estimate
We visit, measure, listen, and come back with a real scope and a real number — not a teaser.
1–2 weeksDesign & permits
Drawings, engineering where needed, product approvals, and the permit package — filed and tracked by us.
4–10 weeksConstruction
Scheduled trades, daily supervision, weekly updates with photos, and inspections we prepare for and attend in person.
Per scopeCloseout & warranty
Punch list cleared, permits closed, documents handed over, warranty in writing. Then we leave it spotless.
1–2 weeksFAQ
Straight answers.
How large an addition does zoning allow on my lot?
Will we need tree permits for the addition?
Is an addition smarter than tearing down and rebuilding?
How long does a home addition take from start to finish?
Can we live at home while you build the addition?
Contact
Put the addition on paper
Bring the wish list: bedrooms, gym, in-law suite. We will walk the lot, check the zoning, and price it in writing, in English o en español.